vendredi 6 mai 2011

Outside overview 3

Outside overview 2

Outside overview 1

Inside detail view 2

Inside detail view 1

Inside overview

Finishes 3: window seal

Finishes 2: Advanced Roof

Finishes 1: Zinc work and roof ventilation

Construction phase 5: Laying windows and doors


Construction phase 4: Laying little ringlet

Construction phase 3: Installation of external cladding

Construction phase 3: Laying of the zinc works

Isolation phase 2: Outside isolation and anti rodent system

Isolation phase 1: Inside isolation


End of the first mounting day.





Some explanations - 3

The beams are held together by bolting.

Some explanations - 2

The panels are held by screws.

Some explanations - 1

The two side panels are composed of 4 parts bolted.

Construction phase 2.2: Laying out walls

Construction phase 2.1: Laying out walls



Reception of the walls.
Set up the walls.

Construction phase 1.2: Basic Structure


Laying the floor insulation (glass wool 160 mm thick) and poses OSB.

Construction phase 1.1: Basic Structure


Creation of the base of the house.